Buying guide

How to choose a case packer

Case packers are harder to compare than palletizers, because the part that decides the outcome — how your specific product gets grouped and loaded — barely appears on a spec sheet. This is how we would evaluate one, including the questions that make us uncomfortable.

By Odecopack engineering · We build the T-BOT Cartesian Case Packer, so read this as informed and interested. Every figure of ours is marked as published.

T-BOT Cartesian Case Packer cell in production
Our machine
T-BOT Cartesian Case Packer
Up to 12 cartons per minute · Omron NX controls

Is a case packer right for you?

Four questions, no email required. You will get an honest read, including the cases where the answer is “not yet”.

01What goes into the case?

Product handling is the part of a case packer that does not generalize between applications.

Six things that decide the outcome

In roughly the order they should change your mind.

  1. What a case packer actually does

    A case packer is the machine between your product and your pallet. It takes finished product, groups it into the arrangement that will go inside a shipping case, loads it in, and closes the case so it is ready to be stacked. It is secondary packaging: the case is the shipping container, not the thing the customer opens on a shelf.

    Almost every case packer does the same three jobs in the same order, and the differences between machines come down to how they do each one. Collation is where the product gets grouped. Loading is where it goes into the case. Closing is where the case gets sealed. When people say a case packer is a good fit or a bad fit for an application, they are almost always talking about collation and loading.

    Collation
    Grouping product into the pattern that goes in the case. The most application-specific part of the machine and the usual source of difficulty.
    Loading
    Placing the grouped product into the case. The T-BOT does this with a Cartesian gantry, which moves on fixed axes rather than an articulated arm.
    Closing
    Sealing the packed case. Unglamorous, and a common source of nuisance stoppages when case blanks vary.
  2. Product handling decides almost everything

    This is the part of a case packer that does not transfer between applications. A machine that runs beautifully with a rigid carton can struggle with a pouch, because the pouch changes shape at exactly the moment the machine needs it not to. Bottles introduce a different problem: they are rigid, but standing upright they are unstable, and how they are held during grouping matters more than how fast the machine moves.

    The practical consequence is that you cannot evaluate a case packer on a spec sheet alone, and you should be suspicious of anyone who lets you try. Bring a sample. A supplier who puts your actual product in front of the machine is telling you something no published figure can.

    It also means honest suppliers narrow rather than broaden. If someone tells you their machine handles everything, they have either not understood your application or are not telling you where it stops.

  3. Case formats and changeover: the cost nobody quotes

    Purchase price is a single event. Changeover is a cost you pay every time the line switches, for the whole life of the machine. Multiply the time by how often you switch and it frequently outweighs the difference between two machines you were agonising over.

    Two things decide that cost: how long a changeover takes, and who can perform it. A changeover an operator completes from the HMI is a fundamentally different operating model than one that needs a technician with tools, even if the clock time is similar.

    We publish that the T-BOT's case-size adjustments are fast and intuitive, and that they help reduce setup and changeover time. We do not publish a number of minutes, because it depends on your formats. Ask us for it against your actual case sizes — and ask every other supplier the same question, in the same terms.

    Ask for a time, against your formats
    Not a generic figure. Two of your real case sizes, start to finish.
    Ask who performs it
    Operator from the HMI, or a technician with tools. This shapes your staffing.
    Ask to watch one
    A changeover performed in front of you, on your own formats, is worth more than any number on a datasheet.
  4. What “up to 12 cartons per minute” actually means

    Published figure: the T-BOT Cartesian Case Packer processes up to 12 cartons per minute, depending on product format, carton size, packaging configuration and line conditions.

    Every throughput figure in this industry is conditional, including ours. The number is measured with a particular product, in a particular carton, in a particular configuration. Change any of those and the number changes with it. That is not evasion; it is how the machines work.

    So the useful question to ask any supplier is never the headline rate. It is what that rate was measured with, and what your format would do to it. A supplier who answers with a range and the conditions attached is being straight with you. A supplier who repeats the headline number without qualification has told you they are quoting marketing, not engineering.

    The second useful question is about sustained versus peak. A machine that hits a rate briefly and a machine that holds it across a shift are different machines, and only one of them solves your problem.

  5. Controls, safety and how the machine joins your line

    Published: the T-BOT runs Omron NX controllers with a touchscreen HMI, and supports EtherNet/IP and Safety over EtherCAT. The system is enclosed with safety-access doors, and higher-grade safety devices can be added to suit a facility.

    Controls decide what happens on a bad day. When the machine stops at 2am, can the person standing in front of it see why on the screen and clear it, or does that stoppage become a phone call? That difference does not appear in a purchase price and dominates how the machine feels to own.

    Networking matters for the same unglamorous reason. A machine that speaks the protocols the rest of your line already speaks is one you can monitor and integrate; one that does not becomes an island with a separate screen nobody looks at.

    Safety is not optional, but its scope is negotiable, and that has cost implications. Standard guarding covers the common case; specific facilities need more. Get the safety scope written into the quote rather than discovered during installation.

  6. When a case packer is not the answer yet

    We would rather say this here than after you have spent money. Automating case packing is the wrong first move in a few common situations, and recognising yours can save you a year.

    If the bottleneck is upstream, a case packer will sit waiting for product and you will have bought capacity you cannot use. If your product or pack format is about to change, wait until it settles — a machine configured around a format you are retiring is an expensive lesson. And if palletizing is still manual while case packing is mostly fine, the pallet is usually the better project, because manual palletizing is heavier work and harder to keep staffed.

    None of this means never. It means sequence matters, and the right order is worth more than the right machine bought early.

    The bottleneck is upstream
    Fix the constraint first, or the new machine idles behind it.
    The pack format is changing
    Configure around the format you are keeping, not the one you are leaving.
    Palletizing is still manual
    Usually the heavier, harder-to-staff job, and often the better first project. You can size that one yourself with our palletizer ROI calculator.
Our machine

What we publish about the T-BOT

These are the figures on our own product page — nothing added for this guide. Where a number is missing, it is missing because it depends on your formats and we would rather answer it against your line than publish something that flatters us.

Throughput
Up to 12 cartons per minute
Depends on format — see below
Motion system
Cartesian gantry, dual 1 kW servo motors
Frame
Welded steel with safety-access doors
Controls
Omron NX controllers, touchscreen HMI
Networking
EtherNet/IP and Safety over EtherCAT
Pricing
Configure to spec
Delivered turn-key with commissioning support

Not published, on purpose: changeover time in minutes, and a list of products the machine handles. Both depend on your formats and your product, and we would be guessing. Ask us both against your own cases.

Request for quotation

What to send for a case packer quote

A case packer quote is only as good as what goes into it. The goal is a realistic machine scope, layout, rate and installed cost — not just the price of the machine. These five inputs decide most of it.

  1. Product dimensions and weight

    Every SKU that will run, with photos — or a physical sample if it is flexible or unstable.

  2. Case dimensions and style

    Length × width × height, and whether it is a regular slotted carton, wraparound, tray or something else.

  3. Pack pattern

    Units per case, rows, layers and orientation, plus any dividers or pads.

  4. Cases per minute

    Sustained rate at the end of the line for each SKU, not the filler's peak speed.

  5. Equipment scope

    What feeds the case packer, whether case erecting and sealing are included, and what happens after it.

Check the rate before anything else

Cases per minute = units per minute ÷ units per case

A line producing 120 bottles per minute, packed 12 to a case, needs 10 cases per minute. Use the sustained rate, add margin for accumulation and upstream stops, and check it for every SKU. The T-BOT is published at up to 12 cartons per minute, depending on format. If your number is well above that, say so and we will tell you plainly whether it is the right machine.

Cases

  • Flat blanks to erect, or cases that arrive already erected
  • Closure: tape, hot-melt glue or none
  • Board grade, labels, barcodes and traceability
  • Case supplier drawings and a few sample cases

Line interfaces

  • Infeed equipment and conveyor heights
  • Accumulation or buffering before the machine
  • Checkweighers, labelers or inspection downstream
  • Whether a palletizer follows, and who supplies the conveyors

Site

  • Floor space, layout and maintenance clearances
  • Electrical supply and compressed air
  • Washdown, dust, temperature or food-grade conditions
  • Site safety standards beyond standard guarding

Controls and services

  • Plant network and PLC standard the machine must talk to
  • Recipe changeover expectations and who performs them
  • Installation, commissioning and training
  • Documentation: drawings, schematics and spare-parts list

What each level of detail gets you

Budget
The five essentials and a rough layout. Enough for a price range with the assumptions written down.
Firm quote
Validated product and case specifications, confirmed rates by SKU, agreed scope boundaries and site details.
Final engineered scope
Product and case samples tested against the pack pattern, a detailed layout and the safety risk assessment.
Send what you have

Case packer questions

Including the two we answer with “it depends”, and why.

Case packer quote

Start with the five essentials

Send product and case dimensions, pack pattern, cases per minute and what the machine connects to. Photos, a sample case or a short line video help. An Odecopack engineer will come back with what can be quoted and what still needs confirming.

Include the information available today. Product dimensions, weight, target rate and a short line video help our engineers evaluate the application faster.

Tell us about your line

Submit your details here. Our team will respond within one business day.

Up to 3 files, 10 MB total. PDF, images, Word, Excel, CSV, DWG or DXF.

PMMI Member

PMMI member companyPackaging & processing technologies

By submitting this form you agree to be contacted by Odecopack USA regarding your request.